Foshan Perfect Resource Building Metal Co., Ltd
  • Home
  • About Us
  • Products
    • Aluminum Formwork
      • Aluminum Formwork System
      • Flat Tie formwork System
      • Rod Tie formwork System
      • Residential Buildings Formwork
      • Villa Aluminum Formwork System
      • Column formwork
      • Table formwork
    • Aluminum Formwork Accessories
      • Pin and Wedge
      • Adjustable Prop
  • News
    • Aluminum Formwork
  • Knowledge
  • Contact Us
  • Produce
  • Design
enLanguage
  • English
Banner
Home / News

News

Latest News

  • Aluminum Alloy Formwork Has Higher Construction Quality And Standardization C...

    Mar 20, 2025

    Aluminum Alloy Formwork Has Higher Construction Quality And Standardization C...

  • Aluminium Alloy Slab Formwork System Is An Advanced And Innovative Building T...

    Mar 12, 2025

    Aluminium Alloy Slab Formwork System Is An Advanced And Innovative Building T...

  • The All Aluminum Alloy Formwork Technology Originated in The United States in...

    Mar 10, 2025

    The All Aluminum Alloy Formwork Technology Originated in The United States in...

  • 19

    May, 2021

    Knowledge Of Aluminum Formwork Industry Must Read

    Perhaps someone around you started talking about aluminum alloy formwork, saying that it has many advantages, and even saying that it can replace wood formwork, bamboo formwork, steel formwork, etc...

  • 07

    May, 2021

    How To Use Aluminum Alloy Formwork For Construction?

    The whole construction process of the aluminum alloy formwork system is as follows: Architectural drawings and structural drawings are designed → aluminum alloy formwork technicians review drawings...

  • 01

    May, 2021

    Do You Know The Application Of Aluminum Template

    In 2018, Vanke took "two mentions and two reductions" as the core goal of advancing industrialization. Instead of doing industrialization for the sake of industrialization, Vanke learned ...

  • 30

    Apr, 2021

    How Did The Aluminum Alloy Template Develop?

    The all-aluminum alloy formwork technology originated in the United States in the 1950s. Since its implementation in developed countries such as the United States and Canada, it has gradually been ...

  • 20

    Apr, 2021

    Let Me Introduce You To The Aluminum Template in A Deeper Level

    The aluminum alloy formwork system can be divided into two categories: tie rod system and pull sheet system according to different stress modes. The tie rod system aluminum alloy formwork is compos...

  • 01

    Apr, 2021

    What Is An Aluminum Template?

    Aluminum alloy formwork is called concrete engineering aluminum alloy formwork, which is a new generation formwork system after plywood formwork, combined steel formwork system, steel frame wood (b...

  • 23

    Mar, 2021

    How Should Building Aluminum Formwork Be Constructed?

    1. Architectural aluminum formwork connection: simple tools, easy assembly, convenient operation, low technical requirements, tight splicing to avoid slurry leakage and misalignment. 2. Adjustable ...

  • 01

    Mar, 2021

    What Problems Should Be Paid Attention To When Removing Building Aluminum For...

    Wall formwork, column formwork and beam side formwork can be removed within 12-24 hours after the concrete is poured. The cantilever bottom support can be removed after 28 days. Under normal circum...

  • 23

    Feb, 2021

    The Use Of Aluminum Alloy Template On Site Requirements

    When using cantilevered external scaffolding, the device positioning diagram of the cantilevered frame should be provided when the aluminum mold design is optimized, and 7-10 days for the installat...

  • 08

    Feb, 2021

    Construction Technical Requirements For Building Aluminum Formwork

    Introduction to Aluminum Formwork What kind of preparatory work should be done to construct aluminum formwork? In order to ensure the smooth construction of the aluminum formwork, it is necessary t...

  • 01

    Feb, 2021

    How much do you know about the matters that should be paid attention to when ...

    When removing the aluminum formwork for construction, pay attention to which wall formwork, column formwork and beam side formwork can be removed within 12-24 hours after the concrete is poured. Th...

  • 18

    Jan, 2021

    What Problems Should Be Paid Attention To When Building Aluminum Formwork Is ...

    When removing the aluminum formwork for construction, pay attention to which wall formwork, column formwork and beam side formwork can be removed within 12-24 hours after the concrete is poured. Th...

First 123456 Last 5/6
Follow Us

Look forward to working with you.
We have more than 10 years of production and use experience for construct the building. After repeated testing, actual application and adjustment, we have accumulated valuable practical experience, so that we can provide more professional, high-quality and safe products and services.

Quick Navigation
  • Home
  • About Us
  • Products
  • News
  • Knowledge
  • Contact Us
  • Produce
  • Design
  • Showroom
  • Sitemap
Categories
  • Aluminum Formwork
  • Aluminum Formwork System
  • Flat Tie formwork System
  • Rod Tie formwork System
  • Residential Buildings Formwork
  • Villa Aluminum Formwork System
  • Column formwork
  • Table formwork
  • Aluminum Formwork Accessories
  • Pin and Wedge
  • Adjustable Prop
Contact Us
  • E-mail:

    pr@nkperfectresource.com

  • Phone:

    +8615918001443

  • Telephone:

    +8615918001443

  • Address:

    NO.6 Building 2 XiYuan YiCuiZunDi, No.3 QiJing Road, Dali Town, NanHai District, FoShan City, GuangDong Province, China

Copyright © Foshan Perfect Resource Building Metal Co., Ltd. All Rights Reserved.

whatsapp
skype

E-mail
Inquiry